The Doors Are Hung And Swinging
May 28 2009 01:00:00 PM
Add/Read Comments [0]
It took about 5 weeks to have them made, but this morning my 34" * 84" * 1 3/4" custom mahogany doors arrived. It took two of us to carry each door, and even then it was a challenge!

The carpenters spend 5 hours framing, hanging, and building the trim and baseboards. Since I don't have a garage, all the cutting was done inside. Thank goodness I covered my furniture. Still, the place was (is) covered in sawdust.

Tada... the doors are hung. Next up is painting the bedroom (behind the doors), painting the new wall, staining the doors, buying/install the door pulls, and having the custom blackout drapes (4 weeks) installed for the bedroom windows and the window above the door.

(sorry for the repost, looks like the images were corrupt in the one from last night)
The carpenters spend 5 hours framing, hanging, and building the trim and baseboards. Since I don't have a garage, all the cutting was done inside. Thank goodness I covered my furniture. Still, the place was (is) covered in sawdust.
Tada... the doors are hung. Next up is painting the bedroom (behind the doors), painting the new wall, staining the doors, buying/install the door pulls, and having the custom blackout drapes (4 weeks) installed for the bedroom windows and the window above the door.
(sorry for the repost, looks like the images were corrupt in the one from last night)